Saturday, November 13, 2010

Work day, 11nov2010, Rockjock trail

Date of work: 11/11/2010
Workers: 1 Ken Crump
Time spent: 9.5 hours including commute
Work performed: Sheared Rockjock from back of Mossy Canyon to Zen Canyon.  Removed fallen debris from trail.

Jim pretty much covered it, but like he said our goal was to make sure the trail was open and easy enough to follow.
Shearing involved anything that was hanging over the trail, and as much of the uphill side that we could get at a slow
walking pace.  There were also a few decayed fallen trees that we were able to upend and flip out of the trail along
with associated limbs.

Overall the summer growth seems to be less heavy each year as the brush and small trees get larger and provide
more shade. 

Hopefully we will be able to make a trip through soon and remove all the smaller logs.  Most were easily stepped
over, but a couple are almost waist high and require sitting and swinging over. 

Thanks for another great day in the woods Jim.

My photos are here:

http://www.flickr.com/photos/ojc/sets/72157625243454689/

Ken

No comments: